- Expansion of the existing (Maxi) Loblaw,
including new Arch and two new front entrances and
new mezzanines.
- Removal of 28 steel columns &
transfer of existing roof loads to the new structure
- Complete demolition of existing
mezzanine & partial demolition of existing roof
- Construction of new office
mezzanine
- Construction of new mezzanine for
the Good Life aerobic centre
- Reinforcement of existing (Maxi)
Loblaw roof for snow accumulations
- Local repairs of slab on grade at
existing expansion/construction joint, new footings & demolished masonry
walls
- Demolition of sections of existing
slab on grade, construction of new insulated slabs for new freezers
- New support structure & framing of
roof openings for new roof top units
- New seismic bracing for new
structure and replacement of demolished bracing in existing structure.
|