Two (2) storey parking garage
located below the office tower;
Complete demolition and
reconstruction of the 2nd level basement reinforced
concrete flat slab structure and
interior and exterior concrete
ramp structures.
Partial localized repairs and
reconstruction of the upper 1st level reinforced concrete
slab structure.
Application of new membrane
systems at 1st and 2nd basement interior parking levels and the
exterior ramps.
Mastic asphalt system installed at
interior 2nd basement parking level.
|